Kankakee County Prevailing Wage for August 2009

Trade Name           RG TYP C Base   FRMAN *M-F>8 OSA OSH H/W   Pensn  Vac  Trng  
==================== == === = ====== ====== ===== === === ===== ===== ===== ===== 
ASBESTOS ABT-GEN        BLD   29.950 30.950 1.5   1.5 2.0 7.290 9.000 0.000 1.100 
ASBESTOS ABT-GEN        HWY   30.360 31.360 1.5   1.5 2.0 7.290 9.000 0.000 0.800 
ASBESTOS ABT-MEC        BLD   29.930  0.000 1.5   1.5 2.0 9.170 9.260 0.000 0.320 
BOILERMAKER             BLD   43.020 46.890 2.0   2.0 2.0 6.720 9.890 0.000 0.350 
BRICK MASON             BLD   37.200 39.200 1.5   1.5 2.0 6.550 8.980 0.000 0.520 
CARPENTER               BLD   34.120 36.120 1.5   1.5 2.0 7.000 11.44 0.000 0.490 
CARPENTER               HWY   34.090 36.090 1.5   1.5 2.0 7.000 11.44 0.000 0.490 
CEMENT MASON            BLD   37.200 39.200 1.5   1.5 2.0 6.550 8.980 0.000 0.520 
CERAMIC TILE FNSHER     BLD   33.480  0.000 1.5   1.5 2.0 6.550 8.980 0.000 0.520 
COMMUNICATION TECH      BLD   31.200 32.700 1.5   1.5 2.0 9.670 9.640 0.000 0.310 
ELECTRIC PWR EQMT OP    ALL   38.600 44.970 1.5   1.5 2.0 9.110 11.34 0.000 0.290 
ELECTRIC PWR GRNDMAN    ALL   30.110 44.970 1.5   1.5 2.0 7.120 8.850 0.000 0.230 
ELECTRIC PWR LINEMAN    ALL   38.600 44.970 1.5   1.5 2.0 9.110 11.34 0.000 0.290 
ELECTRICIAN             BLD   38.600 42.070 1.5   1.5 2.0 10.42 13.65 0.000 0.390 
ELEVATOR CONSTRUCTOR    BLD   36.620 41.200 2.0   2.0 2.0 9.525 8.210 2.190 0.000 
GLAZIER                 BLD   37.000 38.500 1.5   1.5 2.0 7.340 12.05 0.000 0.740 
HT/FROST INSULATOR      BLD   42.050 44.550 1.5   1.5 2.0 9.670 10.81 0.000 0.520 
IRON WORKER             ALL   37.000 40.700 2.0   2.0 2.0 8.140 16.09 0.000 0.600 
LABORER                 BLD   28.950 29.950 1.5   1.5 2.0 7.290 9.000 0.000 0.800 
LABORER                 HWY   29.360 30.360 1.5   1.5 2.0 7.290 9.000 0.000 0.800 
LABORER, SKILLED        BLD   28.950 29.950 1.5   1.5 2.0 7.290 9.000 0.000 0.800 
LABORER, SKILLED        HWY   29.360 30.360 1.5   1.5 2.0 7.290 9.000 0.000 0.800 
LATHER                  BLD   34.120 36.120 1.5   1.5 2.0 7.000 11.44 0.000 0.490 
MACHINIST               BLD   42.770 44.770 1.5   1.5 2.0 7.750 8.690 0.650 0.000 
MARBLE FINISHERS        BLD   33.480  0.000 1.5   1.5 2.0 6.550 8.980 0.000 0.520 
MARBLE MASON            BLD   37.200 39.200 1.5   1.5 2.0 6.550 8.980 0.000 0.520 
MATERIAL TESTER I       ALL   21.550  0.000 1.5   1.5 2.0 7.460 4.840 0.000 0.170 
MATERIALS TESTER II     ALL   26.550  0.000 1.5   1.5 2.0 7.460 4.840 0.000 0.170 
MILLWRIGHT              BLD   34.120 36.120 1.5   1.5 2.0 7.000 11.44 0.000 0.490 
OPERATING ENGINEER      BLD 1 43.800 47.800 2.0   2.0 2.0 9.600 6.550 1.900 1.000 
OPERATING ENGINEER      BLD 2 42.500 47.800 2.0   2.0 2.0 9.600 6.550 1.900 1.000 
OPERATING ENGINEER      BLD 3 39.950 47.800 2.0   2.0 2.0 9.600 6.550 1.900 1.000 
OPERATING ENGINEER      BLD 4 38.200 47.800 2.0   2.0 2.0 9.600 6.550 1.900 1.000 
OPERATING ENGINEER      HWY 1 42.000 46.000 1.5   1.5 2.0 9.600 6.550 1.900 1.000 
OPERATING ENGINEER      HWY 2 41.450 46.000 1.5   1.5 2.0 9.600 6.550 1.900 1.000 
OPERATING ENGINEER      HWY 3 39.400 46.000 1.5   1.5 2.0 9.600 6.550 1.900 1.000 
OPERATING ENGINEER      HWY 4 38.000 46.000 1.5   1.5 2.0 9.600 6.550 1.900 1.000 
OPERATING ENGINEER      HWY 5 36.800 46.000 1.5   1.5 2.0 9.600 6.550 1.900 1.000 
PAINTER                 ALL   31.700 33.700 1.5   1.5 1.5 7.500 7.250 0.000 0.750 
PAINTER SIGNS           BLD   30.820 34.600 1.5   1.5 1.5 2.600 2.470 0.000 0.000 
PILEDRIVER              BLD   34.120 36.120 1.5   1.5 2.0 7.000 11.44 0.000 0.490 
PIPEFITTER              BLD   40.610 42.610 1.5   1.5 2.0 8.500 9.000 0.000 1.010 
PLASTERER               BLD   37.200 39.200 1.5   1.5 2.0 6.550 8.980 0.000 0.520 
PLUMBER                 BLD   40.610 42.610 1.5   1.5 2.0 8.500 9.000 0.000 1.010 
ROOFER                  BLD   37.000 40.000 1.5   1.5 2.0 7.250 5.270 0.000 0.330 
SHEETMETAL WORKER       BLD   41.660 43.660 1.5   1.5 2.0 8.210 10.66 0.000 0.780 
SIGN HANGER             BLD   34.120 36.120 1.5   1.5 2.0 7.000 11.44 0.000 0.490 
SPRINKLER FITTER        BLD   36.140 38.890 1.5   1.5 2.0 8.200 6.550 0.000 0.250 
TERRAZZO FINISHER       BLD   33.480  0.000 1.5   1.5 2.0 6.550 8.980 0.000 0.520 
TERRAZZO MASON          BLD   37.200 39.200 1.5   1.5 2.0 6.550 8.980 0.000 0.520 
TILE MASON              BLD   37.200 39.200 1.5   1.5 2.0 6.550 8.980 0.000 0.520 
TRUCK DRIVER            ALL 1 28.870 29.420 1.5   1.5 2.0 6.690 4.150 0.000 0.000 
TRUCK DRIVER            ALL 2 29.070 29.420 1.5   1.5 2.0 6.690 4.150 0.000 0.000 
TRUCK DRIVER            ALL 3 29.270 29.420 1.5   1.5 2.0 6.690 4.150 0.000 0.000 
TRUCK DRIVER            ALL 4 29.420 29.420 1.5   1.5 2.0 6.690 4.150 0.000 0.000 
TUCKPOINTER             BLD   37.200 39.200 1.5   1.5 2.0 6.550 8.980 0.000 0.520 

Legend:  M-F>8 (Overtime is required for any hour greater than 8 worked
each day, Monday through Friday.
OSA  (Overtime is required for every hour worked on Saturday)
OSH  (Overtime is required for every hour worked on Sunday and Holidays)
H/W  (Health & Welfare Insurance)
Pensn (Pension)
Vac (Vacation)
Trng (Training)

        

Explanations

KANKAKEE COUNTY

The following list is considered as those days for which holiday rates
of wages for work performed apply: New Years Day, Memorial/Decoration
Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day,
Christmas Day. Generally, any of these holidays which fall  on a
Sunday is celebrated on the following Monday.  This then makes work
performed on that Monday payable at the appropriate overtime rate for
holiday pay.   Common practice in a given local may alter certain days
of celebration such as the day after Thanksgiving for Veterans Day.
If in doubt, please check with IDOL.


EXPLANATION OF CLASSES

ASBESTOS - GENERAL - removal of asbestos material/mold and hazardous
materials from any place in a building, including mechanical systems
where those mechanical systems are to be removed.  This includes the
removal of asbestos materials/mold and hazardous materials from
ductwork or pipes in a building when the building is to be demolished
at the time or at some close future date.

ASBESTOS - MECHANICAL - removal of asbestos material from mechanical
systems, such as pipes, ducts, and boilers, where the mechanical
systems are to  remain.

CERAMIC TILE FINISHER, MARBLE FINISHER, AND TERRAZZO FINISHER

The laying, setting and finishing of all tile where used for floors,
walls, ceilings, walks, promenade roofs, stair treads, stair risers,
facings, hearths, fireplaces, and decorative inserts, together with
any marble plinths, thresholds or window stools used in connection
with any tile work; also to prepare and set all concrete, cement,
brickwork, or other foundation or materials that may be required to
properly set and complete such work; the setting or bedding of all
tiling, stone, marble, composition, glass, mosaic, or other materials
forming the facing, hearth or fireplace of a mantle, or the mantle
complete, together with the setting of all cement, brickwork, or other
material required in connection with the above work; also the
slabbing and fabrication of tile mantels, counters and tile panels of
every description and the erection and installation of same and the
building, shaping, forming, construction, or repairing of all
fireplace work, whether in connection with the mantle hearth facing or
not, and the setting and preparing of all material, such as cement,
plaster, mortar, brickwork, iron work or other materials necessary for
the proper and safe construction and completion of such work.  The
term "Ceramic" is used for naming the classification only and is in no
way a limitation of the product handled.  Ceramic takes into
consideration most hard tiles.

COMMUNICATIONS TECHNICIAN

Installing, manufacturing, assembling and maintaining sound and
intercom, protection alarm (security), fire alarm, master antenna
television, closed  circuit television, low voltage control for
computers and/or door monitoring, school communications systems,
telephones and servicing of nurse and emergency  calls, and the
installation and maintenance of transmit and receive antennas,
transmitters, receivers, and associated apparatus which operates in
conjunction  with above systems.  All work associated with these
system installations will be included EXCEPT the installation of
protective metallic conduit in new  construction projects (excluding
less than ten-foot, runs strictly for protection of cable) and 120
volt AC (or higher) power wiring and associated hardware.

LABORER, SKILLED - BUILDING

The skilled laborer building (BLD) classification shall encompass the
following types of work, irrespective of the site of the work: caisson
workers plus depth, gunnite nozzle men, lead man on sewer work,
welders, cutters, burners and torchmen, chain saw operators, paving
breaker, jackhammer and drill operators, layout man and/or drainage
tile layer, steel form setters - street and highway, air tamping
hammerman, signal man on crane, concrete saw operator, screenman on
asphalt pavers, front end man on chip spreader, laborers tending
masons with hot materials or where foreign materials are used,
multiple concrete duct-leadman, luteman, asphalt raker, curb asphalt
machine operator, ready mix scalemen (permanent, portable or temporary
plant), laborers handling masterplate or similar materials, laser
beam operator, concrete burning machine operator, coring machine
operator, plaster tenders, underpinning and shoring of buildings,
material selector when working with fire-brick or castable material,
fire watch, signaling of all power equipment, and tree topper or
trimmer when in connection with construction.

LABORER, SKILLED - HIGHWAY

The skilled laborer heavy and highway (HWY) classification shall
encompass the following types of work, irrespective of the site of the
work: handling of materials treated with oil, creosote, asphalt
and/or any foreign materials harmful to skin or clothing, track
laborers, chloride handlers, the unloading and loading with steel
workers and re-bars, concrete workers (wet), tunnel helpers in free
air, batch dumpers, mason tenders, kettle and tar men, plastic
installers, scaffold workers, motorized buggies or motorized unit used
for wet concrete or handling of building materials, laborers with
de-watering systems, sewer workers plus depth, rod and chainmen,
vibrator operators, mortar mixer operators, cement silica, clay, fly
ash, lime and plasters, handlers (bulk or bag), cofferdam workers plus
depth, on concrete paving, placing, cutting and tying or reinforcing,
deck hand, dredge hand shore laborers, bankmen on floating plant,
asphalt workers with machine, and layers, grade checker, power tools,
stripping of all concrete forms excluding paving forms, dumpmen and
spotters, when necessary, caisson workers plus depth, gunnite nozzle
men, welders, cutters, burners and torchmen, chain saw operators,
paving breaker, jackhammer and drill operators, layout man and/or
drainage tile layer, steel form setters - street and highway, air
tamping hammerman, signal man on crane, concrete saw operator,
screedman on asphalt pavers, front end man on chip spreader, multiple
concrete duct, luteman, asphalt raker, curb asphalt machine operator,
ready mix scalemen (portable or temporary plant), laser beam operator,
concrete burning machine operator, and coring machine operator.

MATERIAL TESTER I:  Hand coring and drilling for testing of materials;
field inspection of uncured concrete and asphalt.

MATERIAL TESTER II:  Field inspection of welds, structural steel,
fireproofing, masonry, soil, facade, reinforcing steel, formwork,
cured concrete, and concrete and asphalt batch plants; adjusting
proportions of bituminous mixtures.

TRUCK DRIVER - BUILDING, HEAVY AND HIGHWAY CONSTRUCTION
Class 1.  Two or three Axle Trucks.  A-frame Truck when used for
transportation purposes; Air Compressors and Welding Machines,
including those pulled by  cars, pick-up trucks and tractors;
Ambulances; Batch Gate Lockers; Batch Hopperman; Car and Truck
Washers; Carry-alls; Fork Lifts and Hoisters; Helpers;  Mechanics
Helpers and Greasers; Oil Distributors 2-man operation; Pavement
Breakers; Pole Trailer, up to 40 feet; Power Mower Tractors;
Self-propelled Chip  Spreader; Skipman; Slurry Trucks, 2-man
operation; Slurry Truck Conveyor Operation, 2 or 3 man; Teamsters;
Unskilled dumpman; and Truck Drivers hauling  warning lights,
barricades, and portable toilets on the job site.

Class 2.  Four axle trucks; Dump Crets and Adgetors under 7 yards;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or
Turnatrailers when pulling  other than self-loading equipment or
similar equipment under 16 cubic yards; Mixer Trucks under 7 yeards;
Ready-mix Plant Hopper Operator, and Winch Trucks,  2 Axles.

Class 3.  Five axle trucks; Dump Crets and Adgetors 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or
turnapulls when  pulling other than self-loading equipment or similar
equipment over 16 cubic yards; Explosives and/or Fission Material
Trucks; Mixer Trucks 7 yards or over;  Mobile Cranes while in transit;
Oil Distributors, 1-man operation; Pole Trailer, over 40 feet; Pole
and Expandable Trailers hauling material over 50 feet long; Slurry
trucks, 1-man operation; Winch trucks, 3 axles or more;
Mechanic--Truck Welder and Truck Painter.

Class 4.  Six axle trucks; Dual-purpose vehicles, such as mounted
crane trucks with hoist and accessories; Foreman; Master Mechanic;
Self-loading equipment  like P.B. and trucks with scoops on the front.

OPERATING ENGINEERS - BUILDING

Class 1.  Assistant Craft Foreman; Craft Foreman; Mechanic; Asphalt
Plant; Asphalt Spreader; Autograde; Batch Plant; Benoto (requires Two
Engineers); Boiler and  Throttle Valve; Caisson Rigs; Central Redi-Mix
Plant; Combination Back Hoe Front End-loader Machine; Compressor and
Throttle Valve; Concrete Breaker (Truck  Mounted); Concrete Conveyor;
Concrete Paver; Concrete Placer; Concrete Pump (Truck Mounted);
Concrete Tower, Cranes, All, Cranes, Hammerhead, Creter  Crane;
Crusher, Stone, etc.; Derricks, All; Derricks, Traveling; Formless
Curb and Gutter Machine; Grader, Elevating; Grouting Machines;
Highlift Shovels or Front  Endloader 2-1/4 yd. and over; Hoists,
Elevators, outside type rack and pinion and similar machines; Hoists,
one, two and three Drum; Hoists, Two tugger One Floor;  Hydraulic
Backhoes; Hydraulic Boom Trucks; Locomotives, All; Motor Patrol; Pile
Drivers and Skid Rig; Post Hole Digger; Pre-Stress Machine; Pump
Cretes; Squeeze  Cretes-screw Type Pumps; Gypsum Bulker and Pump;
Raised and Blind Hole Drill; Rock Drill; Roto Mill Grinder; Scoops -
Tractor Drawn; Slip-form   Paver; Straddle  Buggies; Tie Back Machine;
Tractor with Book and Side Boom; Trenching Machines.

Class 2.  Boilers; Broom, All Power Propelled; Bulldozers; Concrete
Mixer (Two Bag and Over); Conveyor, Portable; Forklift  Trucks;
Greaser Engineer; Highlift Shovels or Front Endloaders under 2-1/4
yd.; Hoists, Automatic; Hoists, Sewer  Dragging Machine; Hoists,
Tugger Single Drum;  Rollers, All; Steam Generators; Tractors, All;
Tractor Drawn Vibratory Roller; Winch Trucks with "A" Frame.

Class 3.  Air Compressor; Asphalt Spreader; Combination - Small
Equipment Operator; Generators; Heaters, Mechanical; Hoists, Inside
Elevators - (Rheostat Manual  Controlled); Hydraulic Power Units (Pile
Driving and Extracting); Pumps, over 3" (1 to 3 not to exceed a total
of 300 ft.); Pumps, Well Points; Welding Machines (2  through 5);
Winches, 4 small Electric Drill Winches; Bobcat (up to and including
3/4 cu. yd.).

Class 4.  Hoists, Inside Elevators, Push Button with Automatic Doors;
Oilers; Brick Forklift.

OPERATING ENGINEERS - HEAVY AND HIGHWAY CONSTRUCTION
Class 1.  Craft Foreman; Asphalt Plant, Asphalt Heater and Planer
Combination; Asphalt Heater Scarfire; Asphalt Silo Tender; Asphalt
Spreader; Autograder; ABG  Paver; Backhoes with Caisson attachment;
Ballast Regulator, Belt Loader; Caisson Rigs; Car Dumper; Central
Redi-Mix Plant; Backhoe w/shear attachments;  Combination Backhoe
Front Endloader Machine, (1 cu. yd. Backhoe Bucket or over or with
attachments); Concrete Breaker (Truck Mounted): Concrete Conveyor;
Concrete Paver over 27E cu. ft.; Concrete Placer; Concrete Tube Float;
Cranes, all attachments; Cranes, Hammerhead, Linden, Peco & Machines
of a like nature;  Crete Crane; Crusher, Stone, etc.; Derricks, All;
Derrick Boats; Derricks, Traveling; Directional Boring Machine over
12"; Dredges; Field Mechanic-Welder; Formless  Curb and Gutter
Machine; Gradall and Machines of a like nature; Grader, Elevating;
Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull
Grader,  Subgrader; Guard Rail Post Driver Mounted; Hoists, One, Two
and Three Drum; Hydraulic Backhoes; Pile Drivers and Skid Rig;
Pre-Stress Machine; Pump Cretes  Dual Ram; Rock Drill - Crawler or
Skid Rig; Rock Drill - Truck Mounted; Rock/Track Tamper; Roto Mill
Grinder; Slip-Form Paver; Soil Test Drill Rig (Truck Mounted);
Straddle Buggies; GCI Crane; Hydraulic Telescoping form (Tunnel); Tie
Back Machine; Tractor Drawn Belt Loader; Tractor with Boom;
Tractor-aire with  Attachments; Traffic Barrier conveyor machine;
Raised or Blind Hole; Trenching Machine; Truck Mounted Concrete Pump
with Boom; Truck Mounted Concrete  Conveyor; Underground Boring and/or
Mining Machines; Wheel Excavator; Widener (APSCO).

Class 2.  Batch Plant; Bituminous Mixer; Boiler and Throttle Valve;
Bulldozers; Car Loader Trailing Conveyors; Combination Backhoe Front
Endloader Machine (less  than 1 cu. yd. Backhoe Bucket or over or with
attachments); Compressor and Throttle Valve; Compressor, Common
Receiver (3); Concrete Breaker or Hydro  Hammer; Concrete Grinding
Machine; Concrete Mixer or Paver 7S Series to and including 27 cu.
ft.; Concrete Spreader; Concrete Curing Machine, Burlap Machine,
Belting Machine and Sealing Machine; Conveyor Muck Cars (Haglund or
Similar Type); Drills, all; Finishing Machine - Concrete; Greaser
Engineer; Highlift Shovels or  Front Endloader; Hoist - Sewer Dragging
Machine; Hydraulic Boom Trucks (All Attachments); Hydro Blaster;
Laser Screed; All Locomotives, Dinky; Pump Cretes;  Squeeze
Cretes-Screw Type Pumps, Gypsum Bulker and Pump; Roller, Asphalt;
Rotory Snow Plows; Rototiller, Seaman, etc., self-propelled; Scoops -
Tractor  Drawn; Self-Propelled Compactor; Spreader - Chip - Stone,
etc.; Scraper; Scraper - Prime Mover in Tandem (Regardless of Size);
Tank Car Heater; Tractors, Push,  Pulling Sheeps Foot, Disc,
Compactor, etc. Tug Boats.

Class 3.  Boilers; Brooms, All Power Propelled; Cement Supply Tender;
Compressor, Common Receiver (2); Concrete Mixer (Two Bag and Over);
Conveyor, Portable;  Farm-Type Tractors Used for Mowing, Seeding,
etc.; Fireman on Boilers; Forklift Trucks; Grouting Machine; Hoists,
Automatic; Hoists, All Elevators; Hoists, Tugger  Single Drum; Jeep
Diggers, Low Boys; Pipe Jacking Machines; Post-Hole Digger; Power Saw,
Concrete Power Driven; Pug Mills; Rollers, other than asphalt; Seed
and  Straw Blower; Steam Generators; Stump Machine; Winch Trucks with
"A" Frame; Work Boats; Tamper - Form-Motor Driven.
Class 4.  Air Compressor - Small and Large; Asphalt Spreader, Backend
Man; Bobcat (Skid Steer) all; Combination - Small Equipment Operator;
Directional Boring  Machine up to 12"; Generators - Small 50kw and
Under; Generators - Large over 50kw; Heaters, Mechanical; Hydraulic
Power Unit (Pile Driving, Extracting, or  Drilling); Hydro-Blaster;
Light Plants, All (1 through 5); Pumps, over 3" (1 to 3 not to exceed
a total of 300 ft.); Pumps, Well Points; Tract-aire; Welding Machines
(2  through 5); Winches, 4 Small Electric Drill Winches.

Class 5.  Oilers and Directional Boring Machine Locator.
Other Classifications of Work:

For definitions of classifications not otherwise set out, the
Department generally has on file such definitions which are available.
If a task to be performed is not subject to one of the
classifications of pay set out, the Department will  upon being
contacted state which neighboring county has such a classification and
provide such rate, such rate being deemed to exist by reference in
this  document.  If no neighboring county rate applies to the task,
the Department shall undertake a special determination, such special
determination  being then deemed to have existed under this
determination.  If a project requires these, or any classification not
listed, please contact IDOL at 217-782-1710 for  wage rates or
clarifications.

LANDSCAPING

Landscaping work falls under the existing classifications for laborer,
operating engineer and truck driver.  The work performed by landscape
plantsman and  landscape laborer is covered by the existing
classification of laborer.  The work performed by landscape operators
(regardless of equipment used or its size) is  covered by the
classifications of operating engineer.  The work performed by
landscape truck drivers (regardless of size of truck driven) is
covered by the  classifications of truck driver.